Turnkey Projects OmBesco Group

NALKORA, WEST BENGAL
Design, Construction, Commissioning and Operation & Maintenance (for 1 year) of Arsenic cum Iron Removal Plant (AIRP).
Capable of reducing raw water Arsenic and Iron Concentration up to acceptable limit.
Capacity: 10.81 m³/hr.
Client: Public Health Engineering Directorate

KRISHNAGUNJ, WEST BENGAL
Design, Construction, Commissioning and Operation & Maintenance (for 1 year) of Arsenic cum Iron Removal Plant (AIRP).
Capable of reducing raw water Arsenic and Iron Concentration up to acceptable limit.
Capacity: 39 m³/hr.
Client: Public Health Engineering Directorate

MIDNAPORE, WEST BENGAL
Design, Construction and Commissioning of 5 Reinforced Concrete Over Head Reservoirs.
Capacities of 450m³, 400m³, 400m³, 350m³, 250m³.
20m staging height on each reservoir.
Allied works for adjoining regions.
Client: Public Health Engineering Directorate